Search
Close this search box.

About The Project

Client

Sydney Metro – Chatswood to Marrickville

Location

South Africa

Length of project

October 2017 – Current

Sydney Metro – Chatswood to Marrickville, John Holland, CPB, Ghella D&C, October 2017 – Current, $2.1 Bil, Senior Project Engineer

The Sydney Metro City and Southwest is a new 30-kilometre metro line that will extend metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and southwest to Bankstown.

  • 16.5 kilometres of new metro line between Chatswood and Sydenham
  • 15.5 kilometres of new twin tunnels
  • 13.5 kilometre upgrade and conversion of the T3 Bankstown Line to metro standards.

The scope of the TSE Works consists of the detailed design, construction and handover of the Running Tunnels, Cross Passages, Nozzle Enlargements, Station Excavations, Rail Crossover, Connections and associated civil works required for the Sydney Metro City and Southwest between Chatswood and the Marrickville area including the crossing beneath the Sydney Harbour. The Project includes procurement of tunnelling plant and equipment, establishment and reinstatement of work sites, spoil handling systems, spoil removal and disposal, all utility and other services to support tunnel construction and station excavation and all required utility relocations and adjustments at construction work sites and station sites.

Rodney is in the position Senior Project Engineer for the Independent Certifier. His responsibilities include Zone manager for the North Zone ( project is divided into North, City & South), reviews and commentary of ITPs, work lots, Work Method statements and Non-conformance reports (NCR’s) and general site surveillance. Awareness of relevant RFI which may be different to the AFC drawings, attendance at Site Meetings, site Process Control Verification audits (PCVs) and Permit to Tunnel presentations (PTT).

DISCLAIMER, LIMITATION AND LIABILITY

  1. Under no circumstances shall Wippenaar Professional Services or the sender of this e-mail be liable to any party for any direct, indirect, special or consequential damages, including, without limitation, any loss of profits, business interruption, loss of programs or other data on information handling systems or otherwise, even if Wippenaar Professional Services or the sender of this e-mail have been expressly advised of the possibility of such damages.
  2. The views and opinions expressed in this e-mail message do not necessarily reflect the views and/or opinions of Wippenaar Professional Services. If this e-mail message is used for purposes unrelated to the official business of Wippenaar Professional Services, Wippenaar Professional Services shall not be liable for any damage liability, infringement or loss caused by the contents of this message and the sender shall take full responsibility therefore in his/her sole and personal capacity.
  3. Wippenaar Professional Services puts the security of the client at a high priority. Therefore, we have put efforts into ensuring that the message is error and virus-free. Unfortunately, full security of the email cannot be ensured as, despite our efforts, the data included in emails could be infected, intercepted, or corrupted. Therefore, the recipient should check the email for threats with proper software, as the sender does not accept liability for any damage inflicted by viewing the content of this email.