Search
Close this search box.

Warringah Freeway Upgrade

Warringah Freeway Upgrade is a critical component to the Western Harbour Tunnel and Beaches Link (WHTBL) Program. The Incentivised Target Cost style contract has a total value of $1.18 billion. It will enable the connection of the new WHTBL motorways into the existing motorway network, ensuring the WHTBL Program delivers its connectivity and safety benefits […]

Vanguard Drive pedestrian bridge, City of Cape Town, January 2005 to December 2005, $ZAR6.6 m, Engineer’s Representative, ASCH Consulting Engineers

Vanguard Drive pedestrian bridge, City of Cape Town, January 2005 to December 2005, $ZAR6.6 m, Engineer’s Representative, ASCH Consulting Engineers The purpose of this project is to provide safe pedestrian linkage between the residents in Langa and Vanguard Community Health Centre in Bonteheuwel, which currently are separated by a Public Main Road (M7 Vanguard Drive). […]

Nad Al Sheba racecourse access, Roads and Transport Authority (RTA) Dubai, May 2009 to December 2009, $US210 m, Bridge Engineer, Aurecon

ASCH Consulting Engineers, Cape Town South Africa, Civil Technician in Building & Transport sections, December 1995 – February 1998 Rodney was in the position of Bridge Engineer from the Aurecon Design Office providing design support to the Nad Al Sheba race course access bridges project. Duties include amongst others; assessing and answering all structural related […]

Southern Freight Link, Australian Rail Track Corporation (ARTC), April 2012 – September 2012, $244 m, Construction Support Co-ordinator, Alliance Contract ARTC – Leightons

Southern Freight Link, Australian Rail Track Corporation (ARTC), April 2012 – September 2012, $244 m, Construction Support Co-ordinator, Alliance Contract ARTC – Leightons The SFL is a 36km, bi-directional, non-electrified, dedicated freight line from Macarthur to Sefton Park Junction in south western Sydney. It will connect with the Metropolitan Freight Network (MFN) at Sefton Park […]

SH16 Trial Embankment, New Zealand Transport Authority (NZTA), June 2011 – April 2012, $NZ6 m, Senior Construction Manager, New Zealand

SH16 Trial Embankment, New Zealand Transport Authority (NZTA), June 2011 – April 2012, $NZ6 m, Senior Construction Manager, New Zealand Rodney was in the position of Senior Construction Manager on State Highway 16 upgrade. The project comprised building a trial embankment to test various soft ground improvement techniques for the Client, NZTA. Rodney was responsible […]

DISCLAIMER, LIMITATION AND LIABILITY

  1. Under no circumstances shall Wippenaar Professional Services or the sender of this e-mail be liable to any party for any direct, indirect, special or consequential damages, including, without limitation, any loss of profits, business interruption, loss of programs or other data on information handling systems or otherwise, even if Wippenaar Professional Services or the sender of this e-mail have been expressly advised of the possibility of such damages.
  2. The views and opinions expressed in this e-mail message do not necessarily reflect the views and/or opinions of Wippenaar Professional Services. If this e-mail message is used for purposes unrelated to the official business of Wippenaar Professional Services, Wippenaar Professional Services shall not be liable for any damage liability, infringement or loss caused by the contents of this message and the sender shall take full responsibility therefore in his/her sole and personal capacity.
  3. Wippenaar Professional Services puts the security of the client at a high priority. Therefore, we have put efforts into ensuring that the message is error and virus-free. Unfortunately, full security of the email cannot be ensured as, despite our efforts, the data included in emails could be infected, intercepted, or corrupted. Therefore, the recipient should check the email for threats with proper software, as the sender does not accept liability for any damage inflicted by viewing the content of this email.