Warringah Freeway Upgrade
Warringah Freeway Upgrade is a critical component to the Western Harbour Tunnel and Beaches Link (WHTBL) Program. The Incentivised Target Cost style contract has a total value of $1.18 billion. It will enable the connection of the new WHTBL motorways into the existing motorway network, ensuring the WHTBL Program delivers its connectivity and safety benefits […]
Vanguard Drive pedestrian bridge, City of Cape Town, January 2005 to December 2005, $ZAR6.6 m, Engineer’s Representative, ASCH Consulting Engineers
Vanguard Drive pedestrian bridge, City of Cape Town, January 2005 to December 2005, $ZAR6.6 m, Engineer’s Representative, ASCH Consulting Engineers The purpose of this project is to provide safe pedestrian linkage between the residents in Langa and Vanguard Community Health Centre in Bonteheuwel, which currently are separated by a Public Main Road (M7 Vanguard Drive). […]
Nad Al Sheba racecourse access, Roads and Transport Authority (RTA) Dubai, May 2009 to December 2009, $US210 m, Bridge Engineer, Aurecon
ASCH Consulting Engineers, Cape Town South Africa, Civil Technician in Building & Transport sections, December 1995 – February 1998 Rodney was in the position of Bridge Engineer from the Aurecon Design Office providing design support to the Nad Al Sheba race course access bridges project. Duties include amongst others; assessing and answering all structural related […]
Southern Freight Link, Australian Rail Track Corporation (ARTC), April 2012 – September 2012, $244 m, Construction Support Co-ordinator, Alliance Contract ARTC – Leightons
Southern Freight Link, Australian Rail Track Corporation (ARTC), April 2012 – September 2012, $244 m, Construction Support Co-ordinator, Alliance Contract ARTC – Leightons The SFL is a 36km, bi-directional, non-electrified, dedicated freight line from Macarthur to Sefton Park Junction in south western Sydney. It will connect with the Metropolitan Freight Network (MFN) at Sefton Park […]
SH16 Trial Embankment, New Zealand Transport Authority (NZTA), June 2011 – April 2012, $NZ6 m, Senior Construction Manager, New Zealand
SH16 Trial Embankment, New Zealand Transport Authority (NZTA), June 2011 – April 2012, $NZ6 m, Senior Construction Manager, New Zealand Rodney was in the position of Senior Construction Manager on State Highway 16 upgrade. The project comprised building a trial embankment to test various soft ground improvement techniques for the Client, NZTA. Rodney was responsible […]